I-69 NB over FIRST CREEK OVERFLOW

03.76 S US 231 · County 027, Indiana · Built 2012 · 2 Lanes · 6,838 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080312
Year Built
2012
Length
83.4 m (273.6 ft)
Max Span
40.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,838
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.