CR 350E over I-69 NB/SB

04.11 N US 50 · County 027, Indiana · Built 2012 · 2 Lanes · 540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
080260
Year Built
2012
Length
72.6 m (238.2 ft)
Max Span
35.6 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
540
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.