I-69 SB over SR 257

01.79 S US 50 · County 027, Indiana · Built 2012 · 2 Lanes · 7,905 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
080232
Year Built
2012
Length
27 m (88.6 ft)
Max Span
26.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
7,905
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.