I-69 NB over CR 125 S

02.17 S SR 57 · County 125, Indiana · Built 2012 · 2 Lanes · 18,595 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

38.402911, -87.328761

This bridge is in worse condition than 8.7% of bridges in County 125. The average bridge in Indiana is 0 years old; this one is 14 years old.

Nearby Bridges

Bridge Details

Structure #
080146
Year Built
2012
Length
16.6 m (54.5 ft)
Max Span
16.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
18,595
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.