I-69 NB over PIGEON CREEK

01.75 N SR 68 · County 051, Indiana · Built 2012 · 2 Lanes · 9,487 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080080
Year Built
2012
Length
397.8 m (1305.1 ft)
Max Span
39.6 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
9,487
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.