I-69 SB over MITCHELL BRANCH

00.50 S SR 54 · County 055, Indiana · Built 2015 · 2 Lanes · 2,417 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
079922
Year Built
2015
Length
193 m (633.2 ft)
Max Span
50.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,417
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.