146th STREET over SR 37 NB/SB

2.54 N I-69 SBL · County 057, Indiana · Built 2022 · 6 Lanes · 23,352 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
076994
Year Built
2022
Length
35 m (114.8 ft)
Max Span
17.2 m
Width
63.6 m (208.7 ft)
Lanes
6
Daily Traffic
23,352
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.