OLIO ROAD over I-69 NB/SB
04.13 S SR 13 · County 057, Indiana · Built 2010 · 4 Lanes · 5,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
39.991081, -85.919
This bridge is in worse condition than 27.2% of bridges in County 057. The average bridge in Indiana is 0 years old; this one is 16 years old.
Nearby Bridges
CAMPUS PARKWAY over I-69
Built 1966
BERGEN BLVD over EE BENNETT DRAIN
Built 2005
286TH ST WEST over PRAIRIE CREEK
Built 1988
136TH ST EAST over MUD CREEK
Built 2003
SOUTHEASTERN PKWY over MUD CREEK
Built 2009
I-69 NB over MUD CREEK
Built 1966
I-69 SB over MUD CREEK
Built 1966
OLIO RD over MUD CREEK
Built 1998
146TH ST EAST over SAND CREEK
Built 2002
BODEN RD over SAND CREEK
Built 2007
Bridge Details
- Structure #
- 076362
- Year Built
- 2010
- Length
- 79.3 m (260.2 ft)
- Max Span
- 40.5 m
- Width
- 22.7 m (74.5 ft)
- Lanes
- 4
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.