I-90 EB over CR 7

00.70 W SR 19 · County 039, Indiana · Built 1998 · 2 Lanes · 14,130 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

41.731289, -85.986869

This bridge is in worse condition than 8.6% of bridges in County 039. The average bridge in Indiana is 0 years old; this one is 28 years old.

Nearby Bridges

Bridge Details

Structure #
047950
Year Built
1998
Length
31.3 m (102.7 ft)
Max Span
13.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
14,130
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.