I-70 EB over N BRANCH MCCRACKEN CREEK

02.25 E SR 39 · County 063, Indiana · Built 1966 · 2 Lanes · 51,175 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
041800
Year Built
1966
Reconstructed
1996
Length
27.7 m (90.9 ft)
Max Span
10.3 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
51,175
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.