I-70 WB over US 231 SB/NB

04.02 E SR 243 · County 133, Indiana · Built 1965 · 2 Lanes · 39,268 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
041630
Year Built
1965
Reconstructed
2020
Length
41.9 m (137.5 ft)
Max Span
20.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
39,268
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.