I-69 SB over GREEN LAKE

00.14 S SR 120 · County 151, Indiana · Built 1966 · 3 Lanes · 9,831 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
040950
Year Built
1966
Reconstructed
2020
Length
315.3 m (1034.4 ft)
Max Span
10.2 m
Width
13.8 m (45.3 ft)
Lanes
3
Daily Traffic
9,831
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.