I-69 SB over NS RR (INDUSTRIAL SPUR)

00.83 N US 30 · County 003, Indiana · Built 1960 · 3 Lanes · 33,169 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
040320
Year Built
1960
Reconstructed
2005
Length
42.9 m (140.7 ft)
Max Span
17.6 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
33,169
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.