I-69 NB over WABASH RIVER ROAD

00.83 S US 224 · County 069, Indiana · Built 1964 · 2 Lanes · 14,360 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
040000
Year Built
1964
Reconstructed
2023
Length
167.9 m (550.9 ft)
Max Span
29.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
14,360
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.