I-65 NB over TURKEY CREEK

02.70 N US 30 · County 089, Indiana · Built 1965 · 4 Lanes · 53,256 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
038620
Year Built
1965
Reconstructed
2020
Length
29.2 m (95.8 ft)
Max Span
11.4 m
Width
33.1 m (108.6 ft)
Lanes
4
Daily Traffic
53,256
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.