I-65 SB over NS RR

03.67 N SR 10 · County 111, Indiana · Built 1966 · 2 Lanes · 40,644 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
038250
Year Built
1966
Reconstructed
2015
Length
45.1 m (148 ft)
Max Span
16.6 m
Width
20.2 m (66.3 ft)
Lanes
2
Daily Traffic
40,644
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$625,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.