I-65 SB over SUGAR CREEK

03.76 S SR 44 · County 081, Indiana · Built 1970 · 2 Lanes · 27,789 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
035750
Year Built
1970
Reconstructed
2016
Length
123.2 m (404.2 ft)
Max Span
25.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
27,789
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.