I-64 WB over HURRICANE CREEK

04.73 W SR 145 · County 123, Indiana · Built 1973 · 2 Lanes · 6,993 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
033920
Year Built
1973
Reconstructed
1993
Length
35.9 m (117.8 ft)
Max Span
13.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
6,993
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.