SR 545 over LEISTNER CREEK

01.31 S SR 56 · County 037, Indiana · Built 1959 · 2 Lanes · 2,585 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
032910
Year Built
1959
Reconstructed
2017
Length
24.9 m (81.7 ft)
Max Span
9.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,585
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$285,000
Total Project Cost
$420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.