SR 358 over WHITE RIVER

01.18 E SR 67 · County 083, Indiana · Built 1985 · 2 Lanes · 1,253 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
031980
Year Built
1985
Reconstructed
2015
Length
153.6 m (503.9 ft)
Max Span
33 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,253
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.