SR 258 over BEATTY WALKER DITCH

06.10 E SR 58 · County 071, Indiana · Built 1979 · 2 Lanes · 2,842 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
031000
Year Built
1979
Reconstructed
2024
Length
31.1 m (102 ft)
Max Span
12.1 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
2,842
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.