CR 1200E over BEAR CREEK

00.46 N OF CR 500 S · County 005, Indiana · Built 2002 · 2 Lanes · 210 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0300004
Year Built
2002
Length
29.2 m (95.8 ft)
Max Span
27.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
210
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.