SR 218 over MORRISON DITCH

00.92 W SR 3 · County 069, Indiana · Built 1992 · 2 Lanes · 1,630 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
028970
Year Built
1992
Reconstructed
2020
Length
24.5 m (80.4 ft)
Max Span
9.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,630
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.