SR 135 over MUSCATATUCK RIVER

03.76 S SR 235 · County 175, Indiana · Built 1954 · 2 Lanes · 1,691 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
026450
Year Built
1954
Reconstructed
1984
Length
130.4 m (427.8 ft)
Max Span
23.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,691
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.