SR 63 over TURMAN CREEK

03.34 N SR 154 · County 153, Indiana · Built 1956 · 2 Lanes · 1,402 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
022570
Year Built
1956
Reconstructed
1996
Length
54.8 m (179.8 ft)
Max Span
20.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,402
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.