SR 59 over EEL RIVER

03.29 S SR 46 · County 021, Indiana · Built 1955 · 2 Lanes · 4,517 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
021260
Year Built
1955
Reconstructed
1984
Length
105.1 m (344.8 ft)
Max Span
28.4 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
4,517
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.