SR 58 over TIPTON CREEK

05.39 W SR 135 · County 071, Indiana · Built 1991 · 2 Lanes · 645 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020950
Year Built
1991
Length
20.7 m (67.9 ft)
Max Span
7.7 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
645
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.