COPPERMINE PASSAGE over WILLOW CREEK BRANCH

0.23 MI E SR3 · County 003, Indiana · Built 2021 · 2 Lanes · 600 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0200685
Year Built
2021
Length
10.5 m (34.4 ft)
Max Span
8.5 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
600
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.