BLUFFTON RD over FAIRFIELD DRAIN

00.10 N WINCHESTER RD · County 003, Indiana · Built 1998 · 4 Lanes · 32,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0200287
Year Built
1998
Length
27.2 m (89.2 ft)
Max Span
9.7 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
32,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.