GOSHEN AVE over LOWTHER-NEWHAUS DRAIN

00.30 E HARRIS RD · County 003, Indiana · Built 1997 · 3 Lanes · 20,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0200285
Year Built
1997
Length
28.7 m (94.2 ft)
Max Span
10.9 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
20,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.