AIRPORT EXPY over HARBER DRAIN
00.40 E AIRPORT DR · County 003, Indiana · Built 1972 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.002147, -85.176408
This bridge is in worse condition than 49.3% of bridges in County 003. The average bridge in Indiana is 0 years old; this one is 54 years old.
Nearby Bridges
BAER RD over HARBER DRAIN
Built 1962
BLUFFTON RD over HARBER DRAIN
Built 1977
FERGUSON RD over HARBER DRAIN
Built 1968
LOWER HUNTINGTON R over FAIRFIELD DRAIN
Built 2008
WINTERS RD over HARBER DRAIN
Built 1976
BLUFFTON RD over HARBER DRAIN
Built 2024
SMITH RD over GRAHAM-MCCULLOCH MAIN
Built 1960
BELLE VISTA DR over FAIRFIELD DRAIN
Built 2014
LOWER HUNTINGTON R over ST MARYS RIVER
Built 1960
SMITH RD over ROBINSON-BRINDLE DRAIN
Built 1974
Bridge Details
- Structure #
- 0200196
- Year Built
- 1972
- Length
- 26.5 m (86.9 ft)
- Max Span
- 10.3 m
- Width
- 26.5 m (86.9 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,740,000
- Total Project Cost
- $4,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.