WILSON RD over HOFFMAN DRAIN #2
00.50 S TILLMAN ROAD · County 003, Indiana · Built 1986 · 2 Lanes · 130 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.015039, -84.930947
This bridge is in worse condition than 76.3% of bridges in County 003. The average bridge in Indiana is 0 years old; this one is 40 years old.
Nearby Bridges
FACKLER RD over HOFFMAN DRAIN #2
Built 1983
SNYDER RD over HOFFMAN DRAIN #2
Built 1975
GERARDOT RD over HOFFMAN DRAIN #2
Built 1951
WEBSTER RD over MCHENRY DRAIN
Built 1976
MAPLES RD over HOFFMAN DRAIN
Built 1950
SNYDER RD over MCHENRY DRAIN
Built 1980
FACKLER RD over MCHENRY DRAIN
Built 1973
TILLMAN RD over MCHENRY DRAIN
Built 1969
SNYDER RD over ELLISON #2 DRAIN
Built 1979
HOFFMAN RD over ELLISON #2 DRAIN
Built 1971
Bridge Details
- Structure #
- 0200131
- Year Built
- 1986
- Length
- 30.1 m (98.8 ft)
- Max Span
- 9.7 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,150,000
- Total Project Cost
- $1,350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.