US 50 over CLEAR SPRING CREEK

03.35 W SR 235 · County 071, Indiana · Built 2018 · 2 Lanes · 4,080 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
018481
Year Built
2018
Length
47.3 m (155.2 ft)
Max Span
46.6 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
4,080
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.