US 41 SBL over S FORK RICHLAND CREEK

00.28 S SR 64 · County 051, Indiana · Built 1959 · 3 Lanes · 10,940 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
014500
Year Built
1959
Reconstructed
2021
Length
26.5 m (86.9 ft)
Max Span
8.6 m
Width
14.7 m (48.2 ft)
Lanes
3
Daily Traffic
10,940
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.