US 40 over BUCK CREEK

00.25 E of North SR 3 · County 065, Indiana · Built 2023 · 4 Lanes · 2,970 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

39.802869, -85.429639

This bridge is in worse condition than 26.2% of bridges in County 065. The average bridge in Indiana is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
014051
Year Built
2023
Length
24.9 m (81.7 ft)
Max Span
24.3 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
2,970
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.