SR 39 over ELK CREEK OVERFLOW

00.34 N SR 256 · County 175, Indiana · Built 1992 · 2 Lanes · 533 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
013055
Year Built
1992
Length
43.2 m (141.7 ft)
Max Span
14.1 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
533
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.