I-69 NBSB over SMITH VALLEY ROAD

003.07 N SR 144 · County 081, Indiana · Built 2023 · 3 Lanes · 21,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
012408
Year Built
2023
Length
69.4 m (227.7 ft)
Max Span
34.2 m
Width
20.2 m (66.3 ft)
Lanes
3
Daily Traffic
21,000
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.