WALNUT ST SB RAMP over I-69 NB/SB

02.92 N SR 46 · County 105, Indiana · Built 1972 · 1 Lanes · 3,745 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012190
Year Built
1972
Reconstructed
2014
Length
81.3 m (266.7 ft)
Max Span
41.1 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
3,745
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.