SR 26 over SALAMONIE RIVER
00.78 E US 27 · County 075, Indiana · Built 2023 · 2 Lanes · 2,902 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
40.43255, -84.963489
This bridge is in worse condition than 5.2% of bridges in County 075. The average bridge in Indiana is 0 years old; this one is 3 years old.
Nearby Bridges
WAYNE STREET over SALAMONIE RIVER
Built 1963
SR 26 over BOLEN DITCH
Built 1946
US 27 over SALAMONIE RIVER
Built 1914
SHIP STREET over SALAMONIE RIVER
Built 1965
SEVENTH STREET over SALAMONIE RIVER
Built 1967
SR 26 over SALAMONIE RIVER
Built 1999
CR 200S over LITTLE SALAMONIE RIVER
Built 1964
US 27 over LITTLE SALAMONIE RIVER
Built 1965
CR 200S over GOLF BROOK
Built 1968
BLAINE PIKE over SALAMONIE RIVER
Built 1960
Bridge Details
- Structure #
- 007041
- Year Built
- 2023
- Length
- 64.7 m (212.3 ft)
- Max Span
- 21.3 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,902
- Material
- Prestressed Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.