SR 18 WB over TIPPEY DITCH
00.20 E I-69 · County 053, Indiana · Built 1993 · 2 Lanes · 2,715 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.553428, -85.546919
This bridge is in worse condition than 85.4% of bridges in County 053. The average bridge in Indiana is 0 years old; this one is 33 years old.
Nearby Bridges
SR 18 EB over TIPPEY DITCH
Built 1964
I-69 NB over SR 18 EB/WB
Built 2019
I-69 SB over SR 18 EB/WB
Built 2020
I-69 NB over TIPPEY DITCH
Built 1963
I-69 SB over TIPPEY DITCH
Built 1963
I-69 SB over LUGAR CREEK
Built 1963
I-69 NB over LUGAR CREEK
Built 1963
CR 700E over LUGAR CREEK
Built 2020
CR 600E over LUGAR CREEK
Built 1989
I-69 NB over TIPPEY DITCH
Built 1963
Bridge Details
- Structure #
- 004860
- Year Built
- 1993
- Length
- 24 m (78.7 ft)
- Max Span
- 8.8 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 2,715
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.