SR 14 over TIPPECANOE RIVER

00.65 E US 35 · County 131, Indiana · Built 1952 · 2 Lanes · 4,468 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
003730
Year Built
1952
Reconstructed
1997
Length
107.8 m (353.7 ft)
Max Span
23.7 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
4,468
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.