SR 9 over EEL RIVER

01.58 S SR 205 · County 183, Indiana · Built 1929 · 2 Lanes · 5,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

41.125972, -85.481236

This bridge is in worse condition than 45.2% of bridges in County 183. The average bridge in Indiana is 0 years old; this one is 97 years old.

Nearby Bridges

Bridge Details

Structure #
002770
Year Built
1929
Reconstructed
2018
Length
23.4 m (76.8 ft)
Max Span
22.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,900
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.