W. DIVISION ST. over BNSF RY & DEEP RUN CREEK

LOCKPORT IL · County 197, Illinois · Built 2001 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPMVRIL0000165
Year Built
2001
Length
135.3 m (443.9 ft)
Max Span
22.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$40,000
Total Project Cost
$42,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.