REND LAKE DAM ROAD over REND LAKE SPILLWAY
REND LAKE · County 055, Illinois · Built 1971 · 2 Lanes · 2,180 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.037831, -88.956417
This bridge is in worse condition than 41.6% of bridges in County 055. The average bridge in Illinois is 0 years old; this one is 55 years old.
Nearby Bridges
CH 39 over SUGAR CREEK
Built 1992
TR 194 over SUGAR CREEK
Built 2003
FAS 1874 REND CTY over BRANCH BIG MUDDY RIV
Built 1971
I 57 SB over MARCUM BRANCH
Built 1962
I 57 NB over MARCUM BRANCH
Built 1962
CH 19 (MARCUM BR) over FAI RTE 57
Built 1962
CS 1000 (BENTON) over TRIB TO SUGAR CREEK
Built 1900
ILL 37 over STREAM S WHITTINGTON
Built 1921
FAU 9452 over SUGAR CREEK
Built 1964
FAU 9441-PETROFF R over FAI RTE 57
Built 1963
Bridge Details
- Structure #
- CEPLMSIL-000003
- Year Built
- 1971
- Length
- 184.4 m (605 ft)
- Max Span
- 30.5 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,180
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $52,000
- Total Project Cost
- $52,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.