SHELBYVILLE DAM over LAKE SHELBYVILLE

SHELBYVILLE IL · County 173, Illinois · Built 1970 · 2 Lanes · 900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPLMSIL-000002
Year Built
1970
Length
50.5 m (165.7 ft)
Max Span
15.3 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$1,458,000
Total Project Cost
$1,480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.