10TH STREET over PETTIBONE CREEK

0.01KM S OF CROSLEY DR · County 097, Illinois · Built 1938 · 2 Lanes · 210 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1IL0S12
Year Built
1938
Reconstructed
1995
Length
9 m (29.5 ft)
Max Span
8.4 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
210
Material
Prestressed Concrete
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.