TR 95 over PANTHER CREEK TRIB

3 mi W of US 51 · County 203, Illinois · Built 2016 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
102504000000000
Year Built
2016
Length
10.7 m (35.1 ft)
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
50
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.