CH 3 over Trib Walnut Crk

0.43 MI N of CH 10 · County 203, Illinois · Built 1966 · 2 Lanes · 225 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
102503700000000
Year Built
1966
Length
9.1 m (29.9 ft)
Max Span
4.5 m
Lanes
2
Daily Traffic
225
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.