CH 2 (2200 N) over I-39 US 51
.49 MI W OF IL 251 · County 203, Illinois · Built 1989 · 2 Lanes · 875 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
40.911153, -89.057547
This bridge is in worse condition than 61.6% of bridges in County 203. The average bridge in Illinois is 0 years old; this one is 37 years old.
Nearby Bridges
TR 41 (2100 N) over I-39 US 51
Built 1990
TR 41 over CROW CREEK
Built 1988
TR 49 over S BR. CROW CREEK
Built 2000
FAS 357 CH2 over CROW CREEK
Built 1986
E 8TH TR 142B over LONG POINT CREEK
Built 1980
TR 121A (200 N) over I-39/US 51
Built 1990
TR 571 over LONG POINT CR
Built 1981
TR 149 (TH-D18) over S BRANCH CROW CR
Built 1969
TR 140C (TH-S55) over S BRANCH CROW CREEK
Built 1973
TR 7 N 0TH RD over STREAM
Built 1989
Bridge Details
- Structure #
- 102004700000000
- Year Built
- 1989
- Length
- 69.5 m (228 ft)
- Max Span
- 50.5 m
- Width
- 19.8 m (65 ft)
- Lanes
- 2
- Daily Traffic
- 875
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.