WHITMAN ST over MADISON ST & RR

0.25 MI E OF MAIN ST · County 201, Illinois · Built 1961 · 4 Lanes · 19,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
101620000000000
Year Built
1961
Reconstructed
2000
Length
101.8 m (334 ft)
Max Span
20.4 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
19,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$941,000
Total Project Cost
$1,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.